With the assistance of a Heritage Economic Regeneration Scheme (HERS) grant a new shopfront was designed and manufactured and the ground floor of the building brought back to commercial use.
The shopfront joinery is elaborately detailed with reeded pilasters framing the doorcases and concentric roll mouldings and roundels to the door panels and stall riser of the shopfront.
The shopfront sits on a Portland stone plinth which addresses the falling ground level and gives the joinery some additional protection from surface water and splashback.